Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19K00419

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19K00419","CONSTRUCTION OF FLOOD CONTROL MARAWI-MASIU NATIONAL ROAD (MASIU SECTION) STA. 1596 + 911","Flood Control and Drainage","Completed",33098703.75,0,100,"Region X","Region X","CDH CONSTRUCTION (37936)","2019-12-27","2020-08-30",2019,"Regular Infra - GAA 2019 LP",7.8101,124.34298,"1903618000","1903600000"]
SHA-256
7aaddbd2036c6da59b9edb80ad31b3746b95a8ec67b25764896b3b31f157aefa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.