Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KA0047

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KA0047","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD (SALUG BRIDGE), SALUG RIVER, SAN FERNANDO, BUKIDNONSAN FERNANDO, BUKIDNON","Flood Control and Drainage","Completed",96500000,0,100,"Bukidnon 1st DEO","Region X","AKN CONSTRUCTION CORPORATION (11845)","2019-07-03","2020-03-31",2019,"Regular Infra - GAA 2019 OO-2",7.75654,125.39774,"1001318000","1001300000"]
SHA-256
c1ecceeb5f1b9e0266ec976769768784bc8a54447038e69a687e565b73cf0e57

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.