Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KA0082

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KA0082","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES WITHIN MINDANAO RIVER BASIN(ALONG PULANGUI RIVER), BRGY. LUMBAYAO SECTION, VALENCIA CITY, BUKIDNONVALENCIA CITY, BUKIDNON","Flood Control and Drainage","Completed",47771415.26,0,100,"Bukidnon 1st DEO","Region X","BISLIG VENTURE CONSTRUCTION & DEV'T. INC. (36370)","2019-07-08","2021-05-28",2019,"Regular Infra - GAA 2019 OO-2",7.94671,125.24676,"1001321000","1001300000"]
SHA-256
7e14e5f41f8447b63f3a9d9ea98e5755b9ca16da987940fc65be76bf3303636b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.