Project 19KC0034
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-19KC0034",
"title": "CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MISAMIS ORIENTAL-BUKIDNON-AGUSAN ROAD (UPSTREAM AND DOWNSTREAM) OF SILOO BRIDGE WITH SLOPE PROTECTION, MALITBOG, BUKIDNON",
"sector": [
"Flood Control and Drainage"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Bukidnon 3rd DEO"
},
"period": {
"startDate": "2019-07-01",
"endDate": "2020-03-16"
},
"budget": {
"amount": {
"amount": 48911990,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
125.02072,
8.55314
]
}
}
],
"parties": [
{
"name": "TRIPARCO DEVELOPMENT CORPORATION",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "19KC0034",
"summary": {
"title": "CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MISAMIS ORIENTAL-BUKIDNON-AGUSAN ROAD (UPSTREAM AND DOWNSTREAM) OF SILOO BRIDGE WITH SLOPE PROTECTION, MALITBOG, BUKIDNON",
"status": "closed",
"contractValue": {
"amount": 48911990,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2019 OO-2",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "62d0502c3245e89124225ad18384af07bb11c2453b83af0d8c2aef54b5b4e7f1"
}
}