Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KC0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KC0035","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MISAMIS ORIENTAL-BUKIDNON- AGUSAN ROAD WITH SLOPE PROTECTION, MALITBOG, BUKIDNON","Flood Control and Drainage","Completed",49000000,0,100,"Bukidnon 3rd DEO","Region X","TRIPARCO DEVELOPMENT CORPORATION (23327)","2019-06-10","2020-03-16",2019,"Regular Infra - GAA 2019 OO-2",8.52884,124.86073,"1001313000","1001300000"]
SHA-256
b35963ad311ad09fea786f4975962ceabe03697d25c10efba6e9c9f7a28592ae

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.