Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KD0066

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KD0066","CONSTRUCTION OF FLOOD CONTROL, BRGY CONSOLACION, CDOC","Flood Control and Drainage","Completed",1447974.07,0,100,"Cagayan de Oro City 2nd DEO","Region X","ZDA CONSTRUCTION AND ENTERPRISES (43494)","2019-07-18","2019-09-25",2019,"Regular Infra - GAA 2019 LP",8.49248,124.6502,"1030500000","1004300000"]
SHA-256
59b4106aa42fedca43d5ea9e24f9b9642221333126cec53ec223e9d47bd034af

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.