Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KE0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KE0027","WIDENING OF TUPSAN BRIDGE (B00008CG) ALONG CAMIGUIN CIRCUMFERENTIAL ROAD","Bridges","Completed",14246402.55,0,100,"Camiguin DEO","Region X","JEJOR'S CONSTRUCTION CORPORATION (5143)","2019-06-10","2020-02-24",2019,"Regular Infra - GAA 2019 OO-1",9.19834,124.7791,"1001804000","1001800000"]
SHA-256
6c9cf70aeeced75b1b76304a211831b503ecf50e468dc59346049866b066dfe2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.