Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KE0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KE0041","CONSTRUCTION OF HUBANGON RIVER CONTROL ALONG HUBANGON BRIDGE I","Flood Control and Drainage","Completed",27974034.89,0,100,"Camiguin DEO","Region X","WDM CONSTRUCTION AND SUPPLIES (18877)","2019-07-08","2020-01-30",2019,"Regular Infra - GAA 2019 OO-2",9.17646,124.78452,"1001803000","1001800000"]
SHA-256
a64cb8d424cba8aa898c4a1a9ab2feb007138dc3151b7b19334d9791ff1000af

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.