Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19KG0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19KG0062","FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF REVETMENT/RIVER CONTROL ON STEEL SHEET PILE ALONG MALABANG-DOBLESTON-TUKURAN ROAD, KAROMATAN BRIDGE (PHASE 2), BRGY. POBLACION, K1989+449-K1989+484,SND","Flood Control and Drainage","Completed",48943026.21,0,100,"Lanao del Norte 2nd DEO","Region X","AL HUSSEIN CONSTRUCTION (18438)","2019-07-19","2020-01-05",2019,"Regular Infra - GAA 2019 OO-2",7.79456,123.72345,"1003506000","1003500000"]
SHA-256
7785a3a9632058c6b7ce0cabe7f4d2c3066c8a8b04afe16a3424943e20871142

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.