Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19LF0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19LF0049","CONSTRUCTION OF FOOT PROTECTION SAN IGNACIO SEAWALL, MANAY, DAVAO ORIENTAL","Flood Control and Drainage","Completed",9798962.01,0,100,"Davao Oriental 1st DEO","Region XI","MITZ CONSTRUCTION AND SUPPLY (41045)","2019-07-18","2019-12-24",2019,"Regular Infra - GAA 2019 OO-2",7.11917,126.49278,"1102508000","1102500000"]
SHA-256
a45c95dff0161f536b651b7c701b9a1cb9ef2db1521ca59e25b23d851fc58b73

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.