Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19M00036

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19M00036","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-PULANGI BANK  PROTECTION, RIGHT & LEFT BANK OF TUNGGOL    FLOODWAY,  PACKAGE B-PHASE 1, STA. 3+689-STA. 3+930","Flood Control and Drainage","Completed",144695950.52,0,100,"Region XII","Region XII","ABU CONSTRUCTION (22313)","2019-10-23","2020-11-20",2019,"Regular Infra - GAA 2019 OO-2",7.07607,124.74184,"1908815000","1908800000"]
SHA-256
b9657e3e6a1a067d6bb2db0d6cef7a1f6ba8fb4c53a3ca38735bd0fa3bfdd9d8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.