Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19MB0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19MB0019","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT UPPER MAKAR BRIDGE, ALONG MAKAR RIVER STA. 0+000 - STA.0+390 (DOWNSTREAM), GENERAL SANTOS CITY, SOUTH COTABAT 1ST LD","Flood Control and Drainage","Completed",48998926.64,0,100,"South Cotabato 1st DEO","Region XII","J.G. ORANZA CONSTRUCTION (33370)","2019-07-09","2019-12-08",2019,"Regular Infra - GAA 2019 OO-2",6.08617,125.10564,"1230800000","1206300000"]
SHA-256
0cef36b8ef030189fd6724ede24e311391e056e58674021911448f3b8e6ab41e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.