Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19MB0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19MB0022","CONSTRUCTION OF CONCRETE REVETMENT STRUCTURE FOR FLOOD MITIGATION FROM SILWAY BRIDGE TO SINAWAL RIVER JUNCTION, BRGY. LABANGAL, GENERAL SANTOS CITY","Flood Control and Drainage","Completed",29398921.96,0,100,"South Cotabato 1st DEO","Region XII","J.G. ORANZA CONSTRUCTION (33370)","2019-07-09","2019-12-15",2019,"Regular Infra - GAA 2019 OO-2",6.11773,125.15998,"1230800000","1206300000"]
SHA-256
fec3647101494c3d6ee79bc860378bbb8d9c2faba24e478bf857b767628b10bf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.