Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19ME0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19ME0052","CONST. OF TUAL RIVER FLOOD CONTROL, KIAMBA, SARANGANI PROVINCE","Flood Control and Drainage","Completed",19280224.71,0,100,"Sarangani DEO","Region XII","LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES) (34789)","2019-07-10","2019-12-24",2019,"Regular Infra - GAA 2019 OO-2",5.98632,124.62039,"1208003000","1208000000"]
SHA-256
5f535992a95187aaa7fa59c79790c9bf0d5aeb7082042913e686253b2543f08b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.