Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19N00039

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19N00039","CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF KALINAWAN- TUBAY RIVERDIKE, TUBAY, AGUSAN DEL NORTE","Flood Control and Drainage","Completed",101324978.84,0,100,"Region XIII","Region XIII","TRIPARCO DEVELOPMENT CORPORATION (23327)","2019-08-15","2020-07-15",2019,"Regular Infra - GAA 2019 OO-2",9.15027,125.54387,"1600203000","1600200000"]
SHA-256
82a60bb33382e1a9e34537de1a5dea9fdde6291f8f9a49270a7ba80fe710273d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.