Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19NG0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19NG0017","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CAMPO RIVER CONTROL / BACUAG, SURIGAO DEL NORTE STA.0+532.00 - STA.0+683.18","GAA 2019 OO-2","Completed",19582436.17,0,100,"Surigao del Norte 2nd DEO","Region XIII","JMT CONSTRUCTION CORPORATION (FORMERLY: JMT CONSTRUCTION) (14186)","2019-07-29","2019-11-05",2019,"Regular Infra - GAA 2019 OO-2",9.57821,125.64111,"1606702000","1606700000"]
SHA-256
807bfcfc71a4441fef22ddbe692a5056c5870ef7f05d70360a7cb8a984a44822

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.