Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19OC0217

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19OC0217","CONSTRUCTION OF SLOPE PROTECTION OF RIDGE (AT THE BACK OF MAKATI BLISS), BRGY. CEMBO,MAKATI CITY, METRO MANILA","Flood Control and Drainage","Completed",2881208.32,0,100,"Metro Manila 2nd DEO","National Capital Region","M.P.Z. CARREON BUILDERS (43569)","2019-10-10","2020-01-05",2019,"Regular Infra - GAA 2019 LP",14.56521,121.05317,"1380300000","1307600000"]
SHA-256
d2f2d296cfbacece303775c2f895bd2483d9a30d7c2c98afddde2234f71efdb6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.