Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19OD0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19OD0021","CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PRINTING, BARANGAY 173, CALOOCAN CITY","Buildings and Facilities","Completed",2864205.95,0,100,"Metro Manila 3rd DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2019-06-27","2019-09-29",2019,"Regular Infra - GAA 2019 LP",14.5955,120.9808,"1380600000","1303900000"]
SHA-256
b2f08139fc6a0b86703cb37c2d297439361d1bfb7d2ad83d95674f0475b20a9c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.