Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19OF0031

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19OF0031","CONSTRUCTION OF  FLOOD CONTROL STRUCTURES, BRGY. COMMONWEALTH (PHASE 4), Q.C.","Flood Control and Drainage","Completed",19967347,0,100,"Quezon City 1st DEO","National Capital Region","TRICHES CONSTRUCTION & TRADING (33876)","2019-07-04","2021-02-07",2019,"Regular Infra - GAA 2019 OO-2",14.69741,121.07627,"1381300000","1307400000"]
SHA-256
2934c3216285deeda96d9cd0fd68a3dc3b2e32e3c2b66f643a2905fcaff30d92

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.