Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19OI0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19OI0012","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAYANAN RIVER,  PUTATAN, MUNTINLUPA CITY","Flood Control and Drainage","Completed",18754497.46,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","AARCON BUILDERS (28336)","2019-06-07","2020-09-01",2019,"Regular Infra - GAA 2019 OO-2",14.4007,121.03791,"1380800000","1307600000"]
SHA-256
43f3a741ad93836f6e0ce6e2c0d843f120765f7c439c0e74c00efb63710c9674

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.