Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19OI0068

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19OI0068","CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT PASONG BAKA (UPSTREAM), LAS PINAS CITY","Flood Control and Drainage","Completed",16578336.8,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","E. F. CHUA CONSTRUCTION, INC. (37826)","2019-07-12","2019-12-08",2019,"Regular Infra - GAA 2019 OO-2",14.41322,120.99934,"1380200000","1307600000"]
SHA-256
ac88d16c0abec8d33581a96160023c8a255bb8bcbf806e39b88ee50d08f962b4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.