Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19P00045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19P00045","REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET","Flood Control and Drainage","Completed",144750000,0,100,"Cordillera Administrative Region","Cordillera Administrative Region","ARCINUE COMM'L CORPORATION (6746) / GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)","2019-11-26","2020-12-11",2019,"Outside Infra - GAA 2019 NDRRMF",16.23631,120.5135,"103312000","103300000"]
SHA-256
c716ab058fa2b7560a8b12934196f089e91c84f737eea04b443b98b7fde284f1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.