Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PA0097

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PA0097","CONSTRUCTION OF FLOOD CONTROL IN BOL-LILISING, VILLAVICIOSA, ABRA","Flood Control and Drainage","Completed",1483000,0,100,"Abra DEO","Cordillera Administrative Region","A.D. MARRERO GENERAL CONSTRUCTION (32448)","2019-10-07","2019-10-27",2019,"Regular Infra - GAA 2019 LP",17.35505,120.59656,"1400119000","1400100000"]
SHA-256
3db458c39466daada41ee67daa07f1b9c93e41951c05068be993d8c18bf6ca75

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.