Project 19PA0100

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PA0100","CONSTRUCTION OF TINEG RIVER FLOOD CONTROL (CARDONA SIDE) STA. 0+000-STA.0+800, STA.1+000-STA.5+220, DOLORES, ABRA","Flood Control and Drainage","Completed",48997000,0,100,"Abra DEO","Cordillera Administrative Region","PHESCO, INCORPORATED (145)","2019-09-24","2020-02-26",2019,"Regular Infra - GAA 2019 OO-2",17.66736,120.70551,"1400107000","1400100000"]
SHA-256
84cee1b8fc3d570e8bce80a50ed4271e110ed02de86568d67a6ae3df6fe5d3f0