Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PB0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PB0015","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF BARREN FLOOD CONTROL (DOWNSTREAM), BRGY. PADDAOAN, CONNER, APAYAO","Flood Control and Drainage","Completed",19011513.88,0,100,"Apayao 1st DEO","Cordillera Administrative Region","OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)","2019-07-29","2020-07-16",2019,"Regular Infra - GAA 2019 OO-2",17.80054,121.28583,"1408102000","1408100000"]
SHA-256
cbfec119179924491e7c6758d19e7c49e5c6fd51c4d23134771d487bda01d73f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.