Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PB0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PB0018","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF NABUANGAN (UPSTREAM) FLOOD CONTROL, BRGY. CUPIS, CONNER, APAYAO","Flood Control and Drainage","Completed",13782174.91,0,100,"Apayao 1st DEO","Cordillera Administrative Region","E.B.J.R. CONSTRUCTION (19780)","2019-06-06","2020-07-20",2019,"Regular Infra - GAA 2019 OO-2",17.79506,121.32597,"1408102000","1408100000"]
SHA-256
6cfcb2c72c942af6ab995b5d6b75c1b0785fbc39da56fe57ec0cf4b5dd6a8e3b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.