Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PB0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PB0019","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL, BARANGAY LUTTUACAN, KABUGAO, APAYAO","Flood Control and Drainage","Completed",19011709,0,100,"Apayao 1st DEO","Cordillera Administrative Region","OMENGAN CONSTRUCTION & DEVELOPMENT CORPORATION (5119)","2019-07-14","2020-09-01",2019,"Regular Infra - GAA 2019 OO-2",17.98739,121.20749,"1408104000","1408100000"]
SHA-256
d8810b0bba47f1fdb5409b52a7ba05cd0d2e16c9a9ae817f4f1a8628458e45ad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.