Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PC0031

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PC0031","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF SAN SEBASTIAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, SAN SEBASTIAN, LUNA, APAYAO","Flood Control and Drainage","Completed",19005970.64,0,100,"Apayao 2nd DEO","Cordillera Administrative Region","ASC CONSTRUCTION & CONCRETE PRODUCTS (26788)","2019-06-10","2019-12-23",2019,"Regular Infra - GAA 2019 OO-2",18.26831,121.40253,"1408105000","1408100000"]
SHA-256
d32a344b092396a502c41bd076e7fbe2e1cb904300a3fc8056a2399c9ca04a81

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.