Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PD0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PD0008","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BALILI RIVER (TRIBUTARIES), BAGUIO CITY","Flood Control and Drainage","Completed",44100000,0,100,"Baguio City DEO","Cordillera Administrative Region","GOLDRICH CONSTRUCTION & TRADING (16489)","2019-07-14","2020-07-26",2019,"Regular Infra - GAA 2019 OO-2",16.43056,120.59875,"1430300000","1401100000"]
SHA-256
4881e41a4061233e6d74501b6ba52ec1c750002796a3dc05b380aacc07228351

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.