Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PE0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PE0022","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 3 SECTION, TUBA, BENGUET","Flood Control and Drainage","Completed",29400000,0,100,"Benguet 1st DEO","Cordillera Administrative Region","AG CONSTRUCTION (42175)","2019-06-28","2020-03-07",2019,"Regular Infra - GAA 2019 OO-2",16.29599,120.59897,"1401113000","1401100000"]
SHA-256
19d80d3bc1b2288bca4e9f72791acd0e0d23cb804f95b951aec5cb23f7b8e865

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.