Project 19PE0032
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PE0032","CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN, BOKOD RIVER SECTION, BOKOD, BENGUET","Flood Control and Drainage","Completed",37103030.45,0,100,"Benguet 1st DEO","Cordillera Administrative Region","F.B. BANTALES ENGINEERING CONSTRUCTION (31045) / KALAHAN GENERAL CONSTRUCTION AND SUPPLIES (38324)","2019-06-17","2020-01-27",2019,"Regular Infra - GAA 2019 OO-2",16.4685,120.7843,"1401104000","1401100000"]
SHA-256
7b1f1f3057fa4625db097c15c60cc535639e16b6fb43f2d090bc23d31e8b25cfHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.