Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PE0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PE0033","CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN, AMBALANGA RIVER SECTION, ITOGON, BENGUET","Flood Control and Drainage","Completed",49000000,0,100,"Benguet 1st DEO","Cordillera Administrative Region","GONZALO CONSTRUCTION (1826)","2019-06-19","2020-04-08",2019,"Regular Infra - GAA 2019 OO-2",16.36346,120.68281,"1401106000","1401100000"]
SHA-256
fde807c4973d6e7d62cdbc174ba48de99560f51dc8edb62b8b34ebea1a88a79d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.