Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PK0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PK0015","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF AYYONG FLOOD CONTROL ALONG MALING RIVER","Flood Control and Drainage","Completed",9547730.73,0,100,"Upper Kalinga DEO","Cordillera Administrative Region","BHM CONSTRUCTION (30724)","2019-06-19","2020-05-12",2019,"Regular Infra - GAA 2019 OO-2",17.45903,121.22432,"1403201000","1403200000"]
SHA-256
0803e30d413f5da9c9f6d788a8f9ec5170a282e4b183676d25034976f3d777c6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.