Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PK0016

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PK0016","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MATALIBONG FLOOD CONTROL","Flood Control and Drainage","Completed",4845150.48,0,100,"Upper Kalinga DEO","Cordillera Administrative Region","JMCWELLS ENGINEERING CONSTRUCTION & DEVELOPMENT (43122)","2019-06-19","2019-12-14",2019,"Regular Infra - GAA 2019 OO-2",17.3602,121.13387,"1403208000","1403200000"]
SHA-256
ccd6cf2ef5e97f781f79351e9d1701d41e313583217a06b81c5a4158655a5ad0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.