Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19PL0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19PL0021","CONTINUATION OF SITIO ASIN FLOOD CONTROL ALONG CHICO RIVER, BRGY. LUCOG, TABUK CITY, KALINGA","Flood Control and Drainage","Completed",9641127.31,0,100,"Lower Kalinga DEO","Cordillera Administrative Region","RT BAGTANG CONSTRUCTION AND DEV'T. CORP. (FORMERLY: MELS CONSTRUCTION & CONCRETE PRODUCTS) (32212)","2019-06-21","2019-10-20",2019,"Regular Infra - GAA 2019 OO-2",17.39633,121.30783,"1403213000","1403200000"]
SHA-256
ec45de8b1eaba9588b861ecb3cf71b79ab522d3e3798a0d90eda4f80031f1d39

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.