Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19Z00020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19Z00020","AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T","GAA 2019 OO-2","On-Going",941218845.54,0,69.13,"Flood Control Management Cluster","Central Office","L.R. TIQUI BUILDERS, INC. (13810) / MSB VITUG CONSTRUCTION INC. (FORMERLY MSB VITUG CONSTRUCTION) (33019)","2019-11-22",null,2019,"Regular Infra - GAA 2019 OO-2",15.97846,120.66547,"105506000","105500000"]
SHA-256
1cdef54e6ae99b9fed59fee1f1e78b9b196fa6e2c67004b8a0a19a7b4e9d5294

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.