Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19Z00035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19Z00035","PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II","GAA 2019 CSSP","Completed",279589887.3,0,100,"Flood Control Management Cluster","Central Office","AKN CONSTRUCTION CORPORATION (11845) / NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2020-02-05","2021-05-29",2019,"Regular Infra - GAA 2019 CSSP",14.5203,121.11633,"1381500000","1307600000"]
SHA-256
ccab4dd7968b09250b45c38b3c91d7f61b636521d8eba70c9d716265f7968f24

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.