Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20AA0002

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AA0002","CONSTRUCTION OF FLOOD CONTROL FACILITIES ALONG BANBAN RIVER, BRGY. UTOL AND BRGY. BANBAN, BANGUI, ILOCOS NORTE","Flood Control and Drainage","Completed",23664961.74,0,100,"Ilocos Norte 1st DEO","Region I","FR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS) (36719)","2020-02-28","2020-08-27",2020,"Regular Infra - GAA 2020 OO-2",18.51947,120.7147,"102804000","102800000"]
SHA-256
271cd544815789fc93cf0b74e21d8373c7914af4a27a3962a8f535e3c4737a81

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.