Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20AA0251

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AA0251","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BRGY. CANAAM, VINTAR, ILOCOS NORTE","Flood Control and Drainage","Completed",97999675.93,0,100,"Ilocos Norte 1st DEO","Region I","NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY (37062)","2020-09-29","2021-05-15",2020,"Regular Infra - GAA 2020 OO-2",18.30977,120.79046,"102823000","102800000"]
SHA-256
80e6d6357b15ce78dd978adf32876185860e8409eeb9458e92188bd854ddf72f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.