Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20AA0263

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AA0263","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOBON CREEK, BRGY. BOBON, BURGOS, ILOCOS NORTE","Flood Control and Drainage","Completed",19599766.89,0,100,"Ilocos Norte 1st DEO","Region I","DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION) (27678)","2020-09-29","2021-04-28",2020,"Regular Infra - GAA 2020 LP",18.50566,120.58542,"102806000","102800000"]
SHA-256
f00b3c356d5e6d6e1c4643b1cde6e9649d2b882fb6eb3212d8526ae43ea19855

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.