Project 20AB0030
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AB0030","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT DONGDONG RIVER FLOOD CONTROL, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE","Flood Control and Drainage","Completed",39199996.35,0,100,"Ilocos Norte 2nd DEO","Region I","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2020-02-18","2020-12-01",2020,"Regular Infra - GAA 2020 OO-2",17.93784,120.67988,"102811000","102800000"]
SHA-256
466252b10b5957b888b9a9671f7c4d39475e8597a662464d200eae82ab805105Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.