Project 20AB0031
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AB0031","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION UNDER THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT ALONG LADING RIVER, BRGY. CABITTAURAN, NUEVA ERA, ILOCOS NORTE","Flood Control and Drainage","Completed",41159998.17,0,100,"Ilocos Norte 2nd DEO","Region I","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2020-02-18","2020-11-12",2020,"Regular Infra - GAA 2020 OO-2",17.93213,120.70406,"102814000","102800000"]
SHA-256
398d27022059d18d3fe7b22ed629a8d3cb24cc34efad34389873e53c24554f4dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.