Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20AD0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AD0051","CONSTRUCTION OF ABRA RIVER CONTROL, NAGPANAOAN SECTION, SANTA, ILOCOS SUR","Flood Control and Drainage","Completed",16011703.62,0,100,"Ilocos Sur 2nd DEO","Region I","M.V. SABALBURO CONSTRUCTION AND SUPPLY (32561)","2020-02-10","2020-05-26",2020,"Regular Infra - GAA 2020 OO-2",17.54802,120.42946,"102922000","102900000"]
SHA-256
8b2f8e2eb5486cfa764a2228235dbe1377d739695271cd8b0cd087d712455352

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.