Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20AH0160

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20AH0160","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DAGUPAN CITY, PANGASINAN","Flood Control and Drainage","Completed",2925327.79,0,100,"Pangasinan 2nd DEO","Region I","MIGHTYWAY CONSTRUCTION AND SUPPLY (40895)","2020-09-10","2020-11-23",2020,"Regular Infra - GAA 2020 LP",16.0238,120.33888,"105518000","105500000"]
SHA-256
ad9619c71a1fab1b94143fb6ed2992433762932800534c4358cae1823fdf69f9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.