Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20BC0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20BC0028","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SANCHEZ MIRA RIVER CONTROL STRUCTURE ALONG SANCHEZ MIRA RIVER, SANCHEZ MIRA, CAGAYAN","Flood Control and Drainage","Completed",24500000,0,100,"Cagayan 2nd DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2020-02-17","2020-12-20",2020,"Regular Infra - GAA 2020 OO-2",18.55732,121.23737,"201522000","201500000"]
SHA-256
ed4ee53e77db4dd522f6de59e6233d7fdc41b4c6b5379efc3f32443319f8c3b3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.