Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20BD0063

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20BD0063","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL SYSTEM -CAMASI, PEÑABLANCA, STA. 0+000 T","Flood Control and Drainage","Completed",62095739.2,0,100,"Cagayan 3rd DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2020-11-23","2021-06-24",2020,"Regular Infra - GAA 2020 OO-2",17.62667,121.77473,"201519000","201500000"]
SHA-256
d2bb8ecfb419945a146054ee7dc39cd0015b5981685dcc8b0c755f182140e6b1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.