Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CD0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CD0004","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (BARDIAS SECTION) PHASE IX, SAN MIGUEL, BULACAN","Flood Control and Drainage","Completed",37435904.25,0,100,"Bulacan 2nd DEO","Region III","L.R. TIQUI BUILDERS, INC. (13810)","2020-02-17","2020-08-02",2020,"Regular Infra - GAA 2020 OO-2",15.24013,121.01928,"301421000","301400000"]
SHA-256
164334ac6b8ebcbdaca4745bab7fc1ebf04f89ed797b749625ee10b9e154cc25

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.