Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CD0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CD0015","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN JOSE RIVER DULONG BAYAN AND MUZON, SAN JOSE DEL MONTE CITY, BULACAN","Flood Control and Drainage","Completed",32584393.47,0,100,"Bulacan 2nd DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2020-02-17","2020-07-28",2020,"Regular Infra - GAA 2020 OO-2",14.81876,121.03784,"301420000","301400000"]
SHA-256
410599ee363dc7098f91402ac228470581ec3a00a3201f26c14be786fcd9f211

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.