Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CD0036

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CD0036","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG OBANDO RIVER,   PHASE III, OBANDO, BULACAN","Flood Control and Drainage","Completed",83888436.19,0,100,"Bulacan 2nd DEO","Region III","STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)","2020-03-03","2020-10-26",2020,"Regular Infra - GAA 2020 OO-2",14.70706,120.92559,"1380900000","1307500000"]
SHA-256
026b350c37fdfe60c57cee6efa6c83bafb8dc4edb7660d26a4e1b09156818de8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.