Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 20CE0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","20CE0048","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TALAVERA RIVER, BRGY. STA. BARBARA, LLANERA, NUEVA ECIJA","Flood Control and Drainage","Completed",35552990.5,0,100,"Nueva Ecija 1st DEO","Region III","IRC CONSTRUCTION & SUPPLIES (29943) / SYMMETRICON BUILDERS CORP. (37555)","2020-02-18","2020-10-14",2020,"Regular Infra - GAA 2020 OO-2",15.70867,121.00107,"304915000","304900000"]
SHA-256
f9b1c1c1dd00447fbe55fd7cdf666144635dd05cc63fb514a33378ad83b62635

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.